Contact HND







Beijing, China

Batemanbeijingaxis Company Limited
Suite 22D, Pine Court, Jin Dao Hua Yuan Xi Ba He Nan Lu Chaoyang,Beijing 100028

Tel: +86 10 6440 2106

Show on Google Maps

 

Expenditure

Various Basic Production Expenditure

Item Classification Price (RMB)
water supply
(Including waste-water treatment fee)
Daily use 2.15RMB/cubic meter
commercial water : service industry 3.60RMB/cubic meter
general industrial enterprise 3.90RMB/cubic meter
paper, chemicals, leather, printing and dyeing, electroplating, pharmaceutical enterprises 4.30RMB/cubic meter
special industry use 4.70RMB/cubic meter (Including waste-water treatment fee)
power supply middle price 28RMB/kVA/month
Heavy industrial use (receiving transformer 315kVA and above) Average price: 0.64RMB/kWs-hour
General industrial use, (receiving transformer below 315kVA) Average price:0.86RMB/kWs-hour,(see the sales table of power in Zhejiang province)
Three hundred thousand RMB/km of private circuits, about 1.2 million RMB/km of special cable in the district
Ground freight (For reference) 20 foot container Shanghai:1500RMB/set
40 foot container Shanghai:2000RMB/set
Labor
(for reference including the wage and insurance)
Skilled worker About 1200RMB/month
Managerial staff About 1500RMB/month
social insurance Endowment insurance Employer 15%, employee 8%
basic medical insurance Employer 7.1%, employee 2%
Construction (for reference) Cost of building Brick or concrete building 700-800RMB/square meter
Steel frame building 700-800RMB/square meter
Cost of lease 12RMB/square meter/month
 

Copyright © 2010, Haiyan Nuclear Economic Development Zone. All Rights Reserved.

Website by Crystal Asia